Mumbai Specifications

Download Specification Sheet 

Download GPX Mumbai Brochure

SECURITY & ACCESS

  • Multi-level physical and electronic security
  • 24/7 security personnel patrols throughout the facility
  • 2 level physical identification before entry
  • Controlled access to facility and colocation rooms through access cards and numbered keypads
  • Digital CCTV system monitors and records entry ways and internal doors
  • Authorised access lists

POWER

  • 4 dedicated 10MVA feeds from 2 diverse substations (additional 4MVA power for future expansion)
  • 4 x 2250KVA Diesel Generators in an N+1 configuration
  • 4 x 750KVA independent UPS systems in an N+1 configuration
  • Average density is 170W per square foot (more power can be delivered to each cabinet based on individual customer
    requirements
  • 60Hrs fuel back-up at full load supported by automatic fuel management system with dual, physical diverse piping to daily fuel tank

COOLING SYSTEM

  • Raised floor with ceiling based return plenum
  • Fully redundant TierIV mechanical systems (chillers, water supply, pumps, valves)
  • Air cooled chillers
  • Hot aisle/cold aisle design with chimney to return plenum

FIRE & WATER SAFTEY

  • Dual alarmed, heat and smoke rate of rise detection and VESDA system
  • Novec fire suppression system, equipment and human friendly
  • Moisture barriers on exterior walls, moisture detection system, waterproofed flooring, expansive drainage system
  • 2Hrs fire rated internal walls with fire stopping material at all service-utilitily entry points

TELECOMMUNICATIONS INFRASTRUCTURE

  • Dual private 100% fully diverse telecommunications meet-me manholes with private conduit
  • Fully isolated Telco room within data center

CABLING

  • Preinstalled and tested structured wiring system providing any-to-any connectivity over fiber, copper or coax media

CROSS-CONNECTION PROCEDURES

  • All cross-connections are initiated by a service order given to the GPX sales team
  • The order form specifies the quantity, media type, source/destination and desired service date
  • There is a 48hour SLA on all cross-connections
  • Typical installation is same day

BMS

  • Our engineers utilize the BMS to monitor and control all aspects of the facilities critical infrastructure both locally & remotely including HVAC, power, security and access, fire and water detection.

STORAGE

  • Loading dock for shipping and receiving
  • Customer work area
  • Locked area for temporary storage